SUCCESS STORIES

Success Stories

    Dome Cover Gets A Facelift

    Local Wastewater Treatment Plant, WI

    Local Wastewater Treatment Plant, WI

    Challenge:

    Restore a delaminating, deteriorating dome cover at a local wastewater treatment plant.

    Solution:
    • Removed deteriorated coatings
    • Cleaned the surface and prepared the dome for coating
      • Used a combination of waterblasting and sandblasting
    • Laid an epoxy primer as a base, promoting adhesion to the UV resistant polyurethane top coat while ensuring long lasting protection
    Results:
    • After spot repairs and coating, this plant expects to get 10-15 more years out of dome cover

    Dome Coating - Before vs. After

     


     

    Need us to help you or your business?

     

    Success Stories

    Crane Engineering has helped many businesses in many different ways.

    318-x-185-read-our-success-stories.jpg